Beachum Construction logoBeachum Construction

Tenant Improvement · Office

Office suites, 9th Street, downtown Sacramento

9th Street, downtown Sacramento

Size

Two-story, 20,012 sq ft building

Type

Office

Year

2015–2019

Location

9th Street, downtown Sacramento

Building lobby with feature stair at 9th Street downtown Sacramento
Lobby with feature stair

Commercial TI across several suites at 9th Street, downtown Sacramento (2015–2019).

A healthcare office (home health & hospice) started in one suite around 2015 and expanded across the hall in late 2018, finishing early 2019. Photos are grouped by suite type — law office, professional office, and healthcare — including Suite 250 build-out progress.

Before & after

From courtrooms to daylight

After the county, Sheriff Internal Affairs, and state Inspector General tenants moved out in 2009, we remodeled this downtown Sacramento building suite by suite. The second-floor spaces that later became a law office and a hospice and home health suite started as Sacramento County Court Divisions 56 and 57 — plain, dark, dingy rooms under T-bar ceilings with no natural light.

We pulled the T-bar down, exposed and cleaned up the beams, and opened the floor plans. The back wall sits on the property line and had been windowless — like a dungeon. We had engineered custom windows made; the building department classified them as a “transparent wall,” so that whole wall now brings in daylight. On the alley side we cut the roof back to the parapet and added high clerestory windows.

Along the wall dividing the barrel-roof area from the hallway ran a long corridor about five feet wide. At the roof we ran a row of skylights down that light well, and the offices on each side got windows onto it — so they now look across at each other through natural light instead of drywall and darkness.

Lounge and corridor

Common-area seating

Exposed-brick corridor

Corridor to suites

Law office

Feature wall mural

Mural by Shane Grammer Arts

Conference room

Glass-front private offices

Office front

Open ceiling and lighting

Professional office

Open office and reception

Workstations

Kitchenette

Toward private offices

Healthcare office

~2015

Open office under wood trusses

Training / meeting room

Meeting room

Healthcare office expansion

2018–2019

Metal-stud framing for the private offices under the existing wood-truss roof

Kitchenette

Open ceiling

Suite 250 build-out in progress

Construction progress for the healthcare office expansion across the hall (late 2018–early 2019) — framing through finishes.

Landscape

Metal-stud framing for the private offices under the existing wood-truss roof

Framing

Open shell with chalk-line layout on the slab and metal studs staged for framing

Layout / start

New window openings cut into the block wall with new dark-frame windows set

Structural / exterior

Concrete block exterior wall saw-cut for new window openings, rebar exposed

Structural demo

Original heavy-timber trusses with steel connections and new HVAC duct run

MEP rough-in / structure

Steel tie brackets anchoring the roof framing to the concrete wall

Structural (seismic)

Drywall going up under the trusses with skylight, ductwork, and spiral duct staged

Drywall / MEP

New second-floor window openings cut into the masonry exterior

Exterior

Gray laminate upper and lower cabinets installed in the break room

Finishes (casework)

New metal-stud walls rising under a skylight in the open shell

Framing

Fabricated steel window surrounds staged on the delivery flatbed

Materials

Laser line used to set wall cabinets level

Finishes (layout)

Portrait

Drywall hung and office fronts framed for glass sidelites down the main corridor

Drywall

Welder in full PPE welding steel at a new window opening

Structural steel

Copper supply and fixture carrier framed into a metal-stud wall

MEP rough-in (plumbing)

Structured data cabling home runs dressed and labeled at the wall

Low-voltage